1·Participate in acceptance check past installation of the equipment accessories above.
参与上述设备及附件的交货检验和竣工验收。
2·Expenses for argumentation, assessment, and acceptance check of research and development results.
研发成果的论证、评审、验收费用。
3·The result of acceptance check decides the effectiveness of the work of auditing department and advisory agency.
验收结果如何,表明审核单位和咨询机构工作成效如何。
4·The passed acceptance check of this pilot project marked the Chinese FM synchronous broadcasting getting into a practical stage.
该试验项目通过验收,标志着我国调频同步广播已走向了实用阶段。
5·This paper introduces the process management from the acceptance check to establishing the account, use and periodical verification.
本文介绍了电子仪器从验收合格—建帐—使用—周检过程的管理。
6·At the end of 2002, this system has passed the acceptance check which is organized by the expert committee of the national science and technology office.
该系统于2002年底通过了国家科技部组织的专家委员会的验收。
7·This paper analyzes the existing issues with monitoring of acceptance check for completed construction projects, and proposes Suggestions on countermeasures.
分析了竣工验收监测工作中存在的问题,提出了对策建议。
8·The acceptance check of safety evaluation for non-coal mine is one of the main basis for safety inspection and approval of non-coal mine construction project.
非煤矿山安全验收评价是矿山建设项目安全验收与审批的主要依据之一。
9·The testing tool has such advantages as low investment and good testing efficiency and can be widely applied in SEP project acceptance check and network operation and maintenance.
检测工具的应用部署投入小,快速检测客户端部署状态效果好,可在SEP项目验收、网络运维中广泛应用。
10·The thesis comments on the hydraulic design, the model test, the runner structure design, the runner field fabrication and the acceptance check. Some proposals are put forward also.
文章就龙滩水轮机转轮的水力设计、模型试验、转轮结构设计、转轮工地制造及转轮的最终验收,进行评述并提出一些建议。
1·Those who make arbitrary use of a completed construction project which should conduct fire control design in accordance with law but has not passed or fail to pass the fire control acceptance check;
依法应当进行消防设计的建筑工程竣工时未经消防验收或者经验收不合格,擅自使用的;
2·Expenses for argumentation, assessment, and acceptance check of research and development results.
研发成果的论证、评审、验收费用。
3·The passed acceptance check of this pilot project marked the Chinese FM synchronous broadcasting getting into a practical stage.
该试验项目通过验收,标志着我国调频同步广播已走向了实用阶段。
4·The thesis comments on the hydraulic design, the model test, the runner structure design, the runner field fabrication and the acceptance check. Some proposals are put forward also.
文章就龙滩水轮机转轮的水力设计、模型试验、转轮结构设计、转轮工地制造及转轮的最终验收,进行评述并提出一些建议。
5·This paper analyzes the existing issues with monitoring of acceptance check for completed construction projects, and proposes Suggestions on countermeasures.
分析了竣工验收监测工作中存在的问题,提出了对策建议。